| Design Review and Construction Supervision of Thakot Bridge over River Indus (KKH) for NHA |
|
Design Review and Construction Supervision of Thakot Bridge
over River Indus
The load curing capacity of existing bridge is required to enhance to
cope with the heavy machinery required to be transported through bridge (KKH) at Basha
Dam site. Further due to change of seismic factor the bridge design as been revised. In
revised design 32 permanent anchors in Piers No. 3, 4 & 7 have been introduced and
foundation sizes have been revised. The project is composed of RCC Box girder, main
bridge of 234 meter long, 85 meter wide with 385m approaches. |
|||||||||