| Detailed Design & Construction Supervision of Bridge Over River Indus B/W Larkana & Khairpur for NHA |
|
Bridge Over River Indus B/W Larkana & Khairpur
National Highway Authority appointed A.A. Associates as a Consultant for
Detailed Design Design and Construction Supervision of Bridge Over River Indus
Connecting Larkana and Khairpur districts. The Project starts near a point about 1.5 Km
from Tando Masti Khan on (realigned) N-5 and enters the bunds of Indus and terminates at
the point about 1 Km from Baqrani on Mohenjo-daro Baqrani Road. The length from N-5 up
to the end of the project at the right bank is about 47 Km. The length of the road upto
the end of the project at right bank of Indus is 8 Km. The length of the Bridge over
Indus is 1222 meters. |
||||||||
