Planning, Design and Construction Supervision of Nowshera Flyover on G-T Road (N-5) for NHA PDF Print E-mail
Planning, Design and Construction Supervision of Nowshera Flyover on (N-5)

 

Image 

ClientNational Highway Authority
Cost 316.6 million 
 Length1120 Meters

Nowshera Flyover is being constructed over existing G-T Road (N-5) passing though Cantonment Area and will span existing railway track and a nullah. It is 1120 m long flyover with approaches on Peshawar and Islamabad Side and will be used by through traffic between Peshawar and Islamabad. Local traffic will use the road underneath and the frontage road at ground. The width of flyover is 20 m and it provides 4 lanes divided highway facility. It will have 26 spans of 21 m each and the approaches will be retained by use of reinforced earth technology.

Scope of Services includes Topographic Surveys, traffic surveys, land acquisition plan, soil and subsoil investigations, Planning and detailed Design of the Flyover, Preparation of detailed Bill of Quantities, cost estimates, and tender documents and Preparation of PC-1 and Feasibility Report