Client Karachi Development Authority
Cost 350 million
Length 28500 m2

Pre-stressed concrete girders, reinforced concrete deck slab, reinforced concrete substructure. This flyover is a multi overpass on a 2 track main railway line and a 6 lane dual carriage road. The superstructure deck of the bridge is designed as signalized with four ramps. Area : 28500 m2 (in plan) Cost :350 million Completed 1994 Services Provided are:

 

  1. Vetting and approval of Design prepared by the Contractor.
  2. Modifications in Design due to site conditions
  3. Detailed Construction Supervision, including measurement, certifications of bills
  4. Progress reporting, cost and time schedule control
  5. Project Completion Report.