Talibwala Bridge Over River Chenab |
|
|
|
Talibwala Bridge Over River Chenab Client | National Highway Authority | Cost | 400 million | Length | 936 meter |
The second Talibwala bridge situated downstream of the existing bridge is to be part of the Lahore - Islamabad Motorway (M-2). The 21.35 m wide dual carriageway bridge is 936 m long with 34 spans of 26 m each. The super-structure consists of precast, prestressed girders with cast-in-place deck slab. The sub-structure consists of 2.0 m diameter bored cast-in-place piles and pier transoms. Services provided were topographical and soil surveys, preliminary design, tender documents, detailed engineering including construction drawings, bill of quantities and cost estimates for second Talibwala bridge and refurbishment of existing Talibwala bridge. |