|
Chablat Nowshera Section N-5 for National Highway Authority (NHA) |
|
Chablat Nowshera Section N-5
| Client |
National Highway Authority |
| Cost |
Rs 2916 million |
| Length |
70.45 km |
National Highway Authority has appointed A.A. Associates to plan
and design additional carriageway between Chablat Nowshera 70.45 km sections of
National Highway N-5. The project involves construction of Additional carriageway
between Chablat Nowshera - 70.454 km section of National Highway N-5. Additional
Carriageway being Constructed is two lane (7.30 wide) with 3 m wide outer shoulders
and 1.00 mm inner shoulders. The pavement structure consist of 50 mm wearing course,
220 mm Asphaltic base course, 220 mm Asphaltic base course, and 190 m aggregate base
course. 2 m width of outer shoulder and 0.5 m width of inner shoulder are surface
treated. The project also include construction of a major bridge over River Indus at
Khairabad with a length of 701 m, 6 spans of 39+40+111+200+200+111 m and width of
10.85 m. 200 m long spans of the bridge are the longest span ever designed and
constructed in Pakistan by Pakistani firms. The other major bridge is road rail over
pass bridge at Burhan. Beside there are 32 minor bridges, and 129 culverts and other
structures. The cost of construction of the Project is estimated to be $ 30.478 and
in funded by GOP. The project has been designed by A. A. Associates.
The services provided include Planning, designing, feasibility
study, PC-I and tender documents. Construction management and administration
including construction supervision of the works, quality control, certification for
payments, issuance of completion certificates, assisting client for land
acquisition, utilities relocation and coordination with government agencies.
|