|
Rehabilitation of Larkana - Naudero Lakhi Road (61Km) including Larkana Ring Road
(4Km) and Larkana City Road (10Km)
| Client |
National Highway Authority |
| Cost |
|
| Length |
75 Km
|
National Highway Authority appointed A.A. Associates as a Consultant for
Detailed Design for Rehabilitation of Larkana – Naudero Lakhi (G.T) Road including
Larkana Ring Road and Larkana City Road. The surrounding area along the road alignment
is all cultivated land. The paved width of existing road (Larkana – Naudero
– Lakhi) is approximately 6.0m with earthen shoulders varying from 1.5m to 2.0m.
There are six bridges on canals and wahs with numerous drainage culverts along with four
railway level crossings. The road is rehabilitate and improves to pavement width 7.3m
with 30m shoulders and extension and rehabilitation of existing bridges and cross
drainage structures. The scope of services includes Alignment study for ECW
through rural and urban areas, Reconnaissance & Topographic survey, Detailed
geometric design, Road Furniture design, Highway Safety Audit Study, Traffic Survey,
present and future capacity analysis, Detailed Soil Investigation / Geotechnical
Investigation for Structures and road, Pavement Design, Design of structures,
intersections and toll plazas, Material survey, Hydrology Study, Detailed report on
construction machinery required during construction phase, Environmental Impact Study
(EIA), Economic Analysis, Tender Documents and Cost Estimates, Land Acquisition folders
and utility and infrastructure folders, Project Definition Plan, Feasibility Study,
Preparation of PC-I, Satisfy Pakistan Railway regarding all necessary technical details
for issuance of NOC for railway bridges.
|