| Remedial works of Makran Coastal (Phore Nai,Hingol River Bridge,Buzi Pass,Basol River Bridge)for NHA |
|
Feasibility Study and Design for Remedial works of Makran Coastal Highway
In February 2005, and again in June July 2007 Makran Coastal Highway was
extensively damaged due to floods caused by un-precedence rains, cyclone resulting in
closure of highway. The damages occurred due to sever flooding which necessitated the
need for restudy of existing design of highway and structures damaged reaches between
Liari and Pasni. Effected areas of Highway are: Phor Nai Km 73 Hingol River Bridge Km
121 Buzi Pass km 154 Jhukki Pass Km 159 Approaches to bridges at km 167 Road Km 232 to
235 Approaches of Basol River Bridge Km 274 Approaches of Bridge at Shadi Kaur km 386
|
|||||||||