University Road Railway Overhead Bridge for Karachi Development Authority (KDA) |
University Road Railway Overhead Bridge Client | Karachi Development Authority | Cost | 228.0 million | | Length | 650 m |
The project provide construction of a 650 m long and a 28.6 m wide 8 lanes bridge including ramps over Karachi Circular Railway Track Crossing University Road near Aziz Bhatti Park. It will uninterrupted traffic flow on the university road. The Superstructure consists of prestressed concrete girders with deck slab and sub structure comprises of pile foundations pier shafts and transoms. Services include topographical and soil surveys, traffic studies and analysis, feasibility study, preliminary detailed design and drawings, tender documents and Evaluation of Bids. |