Richmond(RSRB) Seismic Retrofit (Link to San Francisco), complicated bridge in California
|
|
Richmond - San Rafael Bridge (RSRB) Seismic Retrofit
Length : 4.5 miles
Tonnage : 20,000 tons
Cost : $500 million
Detailing Environment : AutoCAD
Duration : October 2000 to
October 2002
Richmond - San Rafael Bridge is also a vital link to the San
Francisco. It is one of the largest and most complicated bridges in the state of
California. This 4-1/2 miles long bridge, spanning two shipping channels, was completed
in 1956 and is comprised of four distinct sections: the East Approach Structure, the
Main structure, the West Approach Structure and the concrete Trestle section. Since the
bridge is located in very close proximity of the San Andreas and Hayward faults, it was
necessary to upgrade it to modern seismic standards which will prevent it from
collapsing during a major seismic event.
Structural steel detailing of the
retrofit work was carried out in association with A. A. International for the joint
venture of Contractors, Tutor Saliba, Koch Skanska and Tidewater. The work includes
detailing of:
Steel Towers
- New dual, eccentrically braced frames at the taller, two-legged towers of the
existing bridge
- New dual, special moment resisting frames at the shorter, two-legged towers of
the existing bridge
- New two eccentrically braced frames in transverse direction and four in
longitudinal direction at the four-legged anchor towers
- New dual eccentrically braced frames in transverse direction and moment
resisting in longitudinal direction at the main cantilever towers
- New transfer beams or steel collars at the tops of all eccentrically braced and
moment resisting frames to transfer the lateral loads from the existing truss
shoes, bolted to the tops of the existing columns, to the new ductile frames. It
also include the connection between the truss bearing shoes and the tops of all
steel towers
Superstructure
- Selected upper and lower chord members, truss verticals, and member connections
by adding additional cover plates, by replacing existing lacings and by adding
high strength bolts
- New sway bracing at locations were it was omitted and strengthening of in-place
portal and sway frames in the cantilever truss spans
- New rod braces to connect the upper deck to the truss bottom chords
- Floor beam end connections at each truss vertical
- Deck expansion joint and Isolation bearings
|